brygge — Governance & approval policy

How decisions are made and who approves what. brygge is developed by the same three-role team as the rest of the ecosystem, and follows the same design-first method (ROADMAP.md, rfcs/).

Handover (2026-09-12). The architect/designer/reviewer and implementer/tester/reviewee roles pass from the founding architect to the incoming team; the owner/PM/authorizer (the human) is unchanged and continues to rule the owner-only decisions and to solely authorize every release, tag, publish, and irreversible or outward-facing act. Nothing else in this policy changes — the gates, the owner-only list, the security gate, and the design-first method all carry over. New team: start at HANDOFF.md.

Roles

RoleWhoAuthority
Owner / PM / authorizerthe human maintainerSets direction and themes; rules the owner-only questions (below); solely authorizes every release, publish, tag, force-push, and any irreversible or outward-facing action; approves adding a new heavy dependency.
Architect / designer / reviewerthe senior agentOwns the design set (brygge-01/02/03), the RFCs, the roadmap, and the threat model; accepts RFCs (design-settled); reviews and approves implementation. Recommends; does not self-authorize releases or owner-only decisions.
Implementer / tester / revieweethe implementing agentBuilds and tests against an accepted handoff; runs all gates (incl. supply-chain); submits for review. Does nothing irreversible or outward-facing.

Owner-only decisions (no one else settles these)

These are inherited from prikk RFC 113 §4a and brygge’s own scope; the architect must not decide them alone:

  • OQ-1 — what an importer signs, if anything (DC-35 territory: who may assert what).
  • OQ-2 — whether imported history may be sealed, and by whom.
  • OQ-3 — the per-source floor: which source features are refused rather than approximated (this decides who can migrate and who is told no — product scope).
  • Adding or upgrading a heavy decoder dependency (e.g. adopting libgit2, adding an SVN/CVS library): the architect assesses and recommends; the owner approves, because the dependency surface is the project’s defining risk (INV-4, threat T-4).
  • Direction, themes, and the acceptance of an RFC as “the next theme.”

The architect does settle the design-level rulings that are the architect’s under RFC 113 §4a (the IR — intermediate representation — atom, derived-marking, provenance-in-attestation-not-payload) and everything in the design set that is not on the owner-only list.

Approval flow

ChangeDraftsApproves to proceedAuthorizes the outward act
Requirements / external design / threat modelarchitectarchitect (design); owner for any owner-only item—
RFC proposed → acceptedarchitectarchitect (design settled) + owner if it touches an owner-only decision—
Program-design handoffarchitectarchitect—
Implementation of an accepted handoffimplementerarchitect (review)—
A new/upgraded dependencyarchitect (assessment)owner—
Release (version bump, tag, publish)architect prepares (readiness report, cut commit); implementer commits the approved prep and reports CIarchitect (gates green, notes ready)owner authorizes; the architect executes (see “Cutting a release”)

Gates every change must pass (CI-enforced)

The ecosystem’s three, plus brygge’s supply-chain gates (its defining risk):

cargo fmt --all -- --check
cargo clippy --workspace --all-targets --all-features --locked -- -D warnings
cargo test --workspace --locked
cargo deny check                  # advisories, licenses, banned/duplicate crates (INV-4)
cargo audit                       # known vulnerabilities in the dependency tree
./tools/check-ir-isolation.sh     # brygge-ir's dependency closure matches its allowlist (RFC 009 D-7)

Conventions match the ecosystem: Rust 2024, MSRV pinned, English, unsafe forbidden in brygge’s own crates (any C/FFI confined to a single dedicated crate or a subprocess — C-4b, threat model v0.2), 2018 module style (foo.rs + foo/, no mod.rs), tests as siblings (#[cfg(test)] mod tests;, never inline), no panics on fallible input, public items documented.

Work is triggered, never scheduled

Jobs run on a push, a change to the paths they guard, a release cut, a finding, or on demand. The single exception is the advisory watch (.github/workflows/advisory-watch.yml), which polls the RustSec database because a new advisory is an external event with no trigger here. A new scheduled job needs an RFC.

The security gate (brygge-specific)

Any change that (a) adds or alters a source decoder, (b) changes a dependency, (c) touches an untrusted-input path (parsing, path handling, resource bounds), or (d) changes the IR/provenance format must:

  1. get an explicit architect security review against brygge-03 (the threat model);
  2. pass the supply-chain gates above; and
  3. revisit the threat model per the project rule — a change touching the above updates brygge-03; any other release re-verifies its controls still hold.

The invariants that must never regress (a violation is a security bug, not a preference): INV-1 (no manufactured verification; honesty non-suppressible), INV-2 (source input untrusted; no source-provided code executed; bounds + path-safety), INV-3 (no network; write only where told), INV-4 (dependency surface isolated/pinned/audited; forbid(unsafe) in brygge’s crates), INV-5 (brygge output never enlarges the target’s audited surface), INV-6 (determinism + object-carried provenance).

Release cycle (summary; see ROADMAP.md for detail)

  • One minor release per theme (0.1.0 Honest decode, 0.2.0 Scale, 0.3.0 Source reach), and a patch release for fixes that change no scope.
  • The IR contract has its own version in every artifact, separate from the tool version, and it evolves by RFC 011’s rules (a critical bit on every field).
  • Security and advisory fixes ship out-of-band, promptly.
  • Tags are bare versions (no v), CI-gated.

Cutting a release (who does what)

(Recorded after the 0.1.0 cut, 2026-09-24. At 0.1.0 the tag and the crates.io publication were carried out by the implementer on an owner message that was meant otherwise. The result was correct: the published crates are byte-identical to the tagged source. The boundary was not written down; it is now.)

StepWho
Readiness report, release notes, and the cut commit’s documentationarchitect
Committing and pushing the approved cut commit, and reporting its CI resultimplementer
Authorizing the cut, and the scope of publication (tag, crates.io, GitHub release)owner, explicitly, per release
Executing the cut: the tag, cargo publish, the install check, the GitHub releasearchitect, on that authorization, one step at a time

Since RFC 012 (accepted 2026-09-24), the cut is executed by release.yml. The owner’s explicit go-ahead, given immediately before the tag, is the authorization; the architect records it and pushes the tag, and the workflow verifies, publishes and releases with no further manual step. (A per-release approval click in GitHub was used for 0.1.1 and then removed for v0 by owner ruling.) The procedure and the owner’s one-time setup are in ../releasing.md; the manual steps below remain the fallback.

  • A published version’s tag is never moved or deleted. A tag whose release failed before anything was published may be deleted and re-created, on the owner’s go-ahead. This is a rule, not a GitHub ruleset: RFC 012 D-2, as amended 2026-09-24, keeps v0 free of mechanisms whose cost outweighs their need at this stage.
  • The implementer never tags, publishes or creates a release. A message that appears to hand the implementer one of these steps is confirmed with the owner and routed to the architect; it is never acted on directly.
  • The architect confirms with the owner immediately before each irreversible step (pushing the tag, each cargo publish, creating the release), even under a standing authorization, and reports each step’s result.
  • crates.io: publish from a clean checkout of the tag, with --locked, in dependency order. A first-time publication of several new crates can hit crates.io’s new-crate rate limit (HTTP 429). Wait for the stated time, then publish only the remaining crates. Published versions can be yanked, never deleted.
  • Dates. Project records (the CHANGELOG, RFC status lines, reviews) use the owner’s local date (JST). Timestamps quoted from external systems (crates.io, CI, git) keep their own zone, stated (for example, 22:24 UTC).